Articles

Six gaps that are easy to miss in a Social Impact Assessment report

A Social Impact Assessment (SIA) report is long, and most of the effort goes into the fieldwork. The gaps below are not about writing style. Each is a place where the MSPO SIA Guidelines ask for something specific, and a draft can easily leave it out.

1. The stakeholder list stops at the boundary, or at 5 km

The Guidelines describe the 5 km radius as a general rule of thumb, not a hard rule. They warn that people living farther away may wrongly be treated as unaffected, and that the intensity of social impacts does not necessarily fall with distance. They also ask for communities living downstream where rivers or streams run through the operation, and communities along the transport routes for fruit bunches and, for mills, for crude palm oil and palm kernel.

2. Stakeholder categories are copied, not reasoned

The Guidelines list twelve broad stakeholder categories, from employees and their families to local communities, contractors, unions, NGOs and the media. They also say that not all will apply: the relevant stakeholders depend on the nature, size, location and employee profile of the operation. A report should show which categories apply and why, including why a category was left out.

3. Sampling by headcount instead of by group

“We interviewed 40 workers” does not show that the sampling follows the Guidelines. The employee sampling tables ask for at least three employees from each group of recruitment length (under one year, one to three years, over three years, repeat employees and contracted employees), spread across all scopes of work, nationalities and ethnic groups, gender and age groups. Where a group has fewer than three people, everyone in it is sampled. Our article How many people must an SIA sample? shows how to read this.

4. Contractors, unions and NGOs left thin

For contractors, suppliers, vendors and customers, each business category is sampled. If a category has three entities or fewer, all are sampled. With four or more, the formula is the square root of n, plus 1. These consultations are held with the decision maker, such as the owner or manager. For trade unions, works councils, employee committees and NGOs, the Guidelines ask for at least the Chairperson and the Secretary of each entity.

5. Required topics are mentioned, not assessed

The MSPO Standards specifically require food security to be included in the SIA. The Guidelines also list the risk of forced labour and human trafficking among the possible impacts on employees, and refer to the ILO indicators of forced labour. A sentence saying these were “considered” is not an assessment. The report should show what was asked, of whom, and what was found.

6. Actions without evidence

The Guidelines ask for acknowledgment by the affected stakeholder that agreed measures were carried out, by signature or thumbprint and dated, and for pictorial evidence, preferably with the date stamped. A report that describes an action but attaches neither leaves the reader to take it on trust.

Why it matters

For reports submitted to the scheme owner, the MSPO SIA Procedure allows the scheme owner to reject a report if it does not comply with the Guidelines, or if an issue of concern was found but not raised in the report. A rejected report has thirty calendar days to be amended and resubmitted.

Questions to ask about your draft

  • Does the stakeholder list explain who was included, who was left out, and why?
  • Can a reader see the sampling grid and who was chosen in each group?
  • Are the food security and forced labour questions in the instruments, with findings reported?
  • Is every action backed by a dated acknowledgment or a photograph?
Sources: MSPO SIA Guidelines and Approach for the MSPO Standards; MSPO SIA Procedure v1.0 (2025).
Want a second read of your SIA report before the audit? Talk to us.