MSPO and EUDR: two cut-off dates, one set of boundaries
Palm oil producers in Malaysia now work with two deadlines for land use. They look alike, but they are different dates, and they come from different rules.
What each rule says
- MSPO. The revised MSPO standards prohibit conversion of natural forests, protected areas and High Conservation Value areas after 31 December 2019.
- EUDR. The EU Deforestation Regulation requires that relevant products do not come from land deforested after 31 December 2020, and that production is legal in the country of origin.
Why the difference matters
The two dates are a year apart, and the rules do not define forest in exactly the same way. A plot can therefore be treated differently by each rule, so each needs to be checked against its own requirement. Certification can supply useful information for due diligence, but it does not by itself discharge it.
When EUDR applies
According to the European Commission, EUDR applies from 30 December 2026 to large and medium operators and traders, and from 30 June 2027 to micro and small enterprises. The EU updates dates and guidance, so confirm the current position.
One set of boundaries, two checks
Both rules start from the same question: where exactly is each plot? EUDR asks for geolocation of each plot of production: one point for plots up to four hectares, and a polygon outlining the perimeter for larger plots. A verified set of plot boundaries lets you run the land-use check for each cut-off date from the same base.
Questions to ask your team
- Do we have a boundary for every plot, in a format that can be shared?
- Does the area on the map agree with the area on the land title?
- What was the land use of each plot at the end of 2019 and at the end of 2020?
- For fruit bunches bought from other growers, do we know which plots they come from?